Call Us Today

+86-577-61775655

Call Us Today

+86-137-36379295
You are here: Home » News » Product News » How do maintenance and repair Tube And Part?

How do maintenance and repair Tube And Part?

Views: 0     Author: Site Editor     Publish Time: 2022-11-07      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Now theTube And Partcan be said to become a major production enterprise will use the equipment, through such equipment, but also for the tube to complete the corresponding cutting and processing, especially the realization of automated production processing, greatly improving the efficiency of this equipment, but in ordinary times also need to pay attention to good maintenance and maintenance, specific need to do which points? Here are some answers.



Here is the content list:

  • Do a good job of cleaning and inspection of Tube And Part.

  • Pay attention to the replacement of Tube And Part parts.

  • Tube And Part voltage and commissioning.



Do a good job of cleaning and inspection of Tube And Part.


Tube And Part maintenance and maintenance are very important, first of all, you need to pay attention to cleaning the equipment oil tank, and cleaning the oil filter of each pump. Do the corresponding inspection, if such equipment is found to have some abnormalities, can not work properly, first confirm where the failure is, and then can do a timely inspection and repair. In addition, when we want to Tube And Part for the actual maintenance process, to protect the original service life of the entire equipment, then it is recommended that we must be in various places in the machine before the start of the red spot in time to apply a variety of different special oil. Machine rotation must be in the clockwise direction of rotation, and can not be reversed to avoid causing the original damage to mechanical parts failure.



Pay attention to the replacement of Tube And Part parts.


Clean the water tank and filter the hydraulic sump again within 1-2 months after using the Tube And Part machinery for the first time. Hydraulic pumping station position each connection head is equipped with sealing ring damage, oil penetration, and oil-resistant rubber seals that should be replaced promptly. Especially in the case of a long period does not need to run, or should pay attention to do a good job of the corresponding inspection to ensure that this equipment can get a good application, extending the service life of the equipment.



Tube And Part voltage and commissioning.


In the process of using Tube And Part, we must use a correct voltage, the input voltage error range should be guaranteed within 10 volts, and to ensure that the entire machine can be properly grounded so that you can avoid the maximum extent of the injury. If you want to debug the whole Tube And Part, then we must pay attention to the process we use, before adjusting the best to turn off the power, unplug, and ensure safety, do not let some non-operating personnel close. It is worth noting that when the temperature is relatively low, the butter inside the machine may freeze, must use the manual adjustment of the hole to insert a variety of wrenches, and we must be in this direction for each different place to go around, to lubricate the position plus some room temperature oil, and slowly around to the knife mouth smooth place, so that you can.



So, now the Tube And Part equipment, the reason is the need to pay attention to do a good job of maintenance and maintenance or should pay attention to do such points. Only in this way can the maintenance of the equipment be completed, so that the service life of the equipment can be extended, especially through such equipment, to complete the specific cutting and processing of the pipe, so that the specific role of this equipment can be directly played. Our official website is https://www.anruk.com/. If you want to know more about our company, you can communicate with us on our website.

We are produce the  brass,plastic ,iron and zinc alloy Material pneumatic fitting ,brass fitting ,Polyurethane Tube(PU tube),PU coil tube , PVC and nylon hose ,water hose .....

Leave a Message
Leave A Message

Quick Links

Product Category

Call Now For Service!

  +86-577-62922658
   +86-137-36379295
  No. 18, Liujiang Road, Liushi Town, Wenzhou, Zhejiang, China
Copyright 2021 Wenzhou Ang Rui Machinery Co., Ltd. All Right Reserved.  Sitemap  Support By Leadong